| |
"When problems arose, HOLADAY-PARKS provided the manpower and expertise to solve
the issues."
—JE Dunn Construction
|
|
|
Technology Environments
When data centers are operating around-the-clock at full speed, cooled air becomes a critical business component. At HOLADAY-PARKS we specialize in designing and installing mechanical systems for these unique technological environments.
World Trade Center - Seattle, WA
Designed and installed state-of-the-art HVAC and Controls systems for this 3-tower high-tech office environment (East tower 6-story 190,00 square feet, West tower 4-story 67,600 square feet, and North tower 5-story 140,000 square feet).
Costco Data Center - Issaquah, WA
Provided sheet metal fabrication and installation services for this 400-ton raised-floor data center contained within Costco’s 170,000 square foot headquarters (a building which HP also provided mechanical
design/build services for).
Nintendo Corporation - Redmond, WA
HP served as the full-service mechanical contractor for this 295,000 square foot headquarters building featuring a high-bay distribution facility with robotized automated storage and retrieval system, office space, and a raised-floor
computer room..
Schnitzer Northcreek - Bothell, WA
Fabricated and installed the mechanical systems for this 15 building campus incorporating over 960,000 square feet of business space. Tenants include: Microvision, Pentar Avionics, Allied Telesyn, Deluxe Scan, and Data Critical to name a few.
Microsoft Studios - Redmond, WA
Designed and installed the mechanical systems for this 50,000 square foot remodel with the addition of a 15,000 square foot mezzanine. The project features a production and post-production facility, 3 large stages, and a state-of-the art technology integration lab.
BACK to our Main Portfolio
or visit the environments below—
(back to top)
|
|
|
W
TECHNOLOGY

World Trade Center

Costco Data Center

Nintendo Corporation

Schnitzer Northcreek

Microsoft Studios
|
|